Golden EightConstruction Sdn Bhd
HomeAboutProjectsView Our Projects
Civil infrastructure construction
Our Portfolio

The work speaks for us.

A selection of civil, infrastructure, drainage, water treatment and building projects delivered by Golden Eight across the public and private sectors.

Selected Work

A panorama of projects delivered.

Scroll across our work. It pans forward as you scroll down, and back as you scroll up.

Township Infrastructure & Earthworks
2023

Township Infrastructure & Earthworks

Infrastructure. Site earthworks, road formation and kerbing for a mixed-development township to local authority standards.

Sewage Treatment Plant (STP) Package
2022

Sewage Treatment Plant (STP) Package

Water Treatment. Civil and structural works for a community STP, including reticulation tie-ins and access works.

Industrial Park Drainage System
2021

Industrial Park Drainage System

Drainage. Stormwater drainage and grating for an industrial park, engineered for high-volume runoff.

Water Reticulation Network
2022

Water Reticulation Network

Water Treatment. Water reticulation and sewer line installation servicing a new residential precinct.

Commercial Block Structural Works
2024

Commercial Block Structural Works

Building. Reinforced-concrete structural and building works for a low-rise commercial block.

Metalwork Grating & Walkways
2021

Metalwork Grating & Walkways

Metalwork. Fabrication and installation of metalwork grating for drainage channels and access walkways.

Project Listing

Delivered across the region.

Filter the portfolio by discipline. Each project reflects a full scope handled by one accountable team.

InfrastructureTownship Infrastructure & Earthworks
Iskandar, Johor

Township Infrastructure & Earthworks

Site earthworks, road formation and kerbing for a mixed-development township to local authority standards.

Completed2023
Water TreatmentSewage Treatment Plant (STP) Package
Pasir Gudang

Sewage Treatment Plant (STP) Package

Civil and structural works for a community STP, including reticulation tie-ins and access works.

Completed2022
DrainageIndustrial Park Drainage System
Kulai

Industrial Park Drainage System

Stormwater drainage and grating for an industrial park, engineered for high-volume runoff.

Completed2021
Water TreatmentWater Reticulation Network
Senai

Water Reticulation Network

Water reticulation and sewer line installation servicing a new residential precinct.

Completed2022
BuildingCommercial Block Structural Works
Johor Bahru

Commercial Block Structural Works

Reinforced-concrete structural and building works for a low-rise commercial block.

Ongoing2024
MetalworkMetalwork Grating & Walkways
Pasir Gudang

Metalwork Grating & Walkways

Fabrication and installation of metalwork grating for drainage channels and access walkways.

Completed2021
InfrastructureRoad & Kerb Upgrading Works
Kulai

Road & Kerb Upgrading Works

Road resurfacing, kerb and drainage upgrading along an industrial access corridor.

Completed2020
MetalworkSite Perimeter Fencing
Senai

Site Perimeter Fencing

Perimeter fencing and gating for a secured industrial compound, with supporting civil works.

Completed2023
DrainageStormwater Culvert & Outfall
Iskandar, Johor

Stormwater Culvert & Outfall

Box culvert and outfall structures forming the spine drainage for a township phase.

Ongoing2024
Have a project in mind?

Let's build something that lasts.

Detailed project pages and direct enquiry are coming in the next phase. In the meantime, learn more about the team behind these works.